Maintain existing arterial drainage channels along the Gorragh River; Remove the existing weir and localised levelling of the River bed on the Clodiagh River upstream of the R422 Bridge; Increase channel capacity by dredging a section of the Clodiagh River. The North City Drainage Network Upgrades was initiated in 2010 following major flooding in August 2008 and July 2009 with construction subsequently commencing in 2012. Flood Risk Management Plan for the Shannon Upper and Lower River Basin. Ba cheart comhairle ghairmiil n speisialtra a lorg sula ndanfar, n sula staonfar , aon ghnomh a bheadh bunaithe ar an Larscili Tscach Abhann Nisinta n ar bhar an Lithrein Ghrasin. The hard defences would protect to the 1% AEP fluvial flood event with an average and maximum height of 1.2m and 2.9m respectively and a total length of 3.0km of wall and a total length of 2.1km of embankment. These works were undertaken by Limerick City Council with funding from the OPW and are maintained under local authority duties. account coastal flooding from a combination of tide levels and storm surges; any significant impact from other sources Where the boundary of a flood has been mapped, the flood is shown as a shaded area with a blue border defining the extent of the flood. The proposed further measure consists of building hard defences, at risk properties would be protected by a series of flood embankments on the Burrin River and on the Knocknagee Stream in the Castle Oaks area. The maps were derived from synthetic aperture radar (SAR) data acquired by the Copernicus Sentinel-1 satellites, operated by the European Space Agency (ESA). The proposed measure for Baltray that may be implemented after project-level assessment and planning or Exhibition and confirmation might include physical works, such as a series of hard defences (flood embankments and walls), largely constructed along a new line set back from the existing line of defences. This layer shows the modelled extent of land that might be flooded by rivers in a severe flood event. Arterial Drainage Schemes were carried out under the Arterial Drainage Act, 1945 to improve land for agriculture and to mitigate flooding. The Lower Lee Flood Relief Scheme was initiated in 2013 following major flooding in 2009 and 2012. Construction of the South and West phases was commenced in 2012. These defences range from 0.6 1.9m in height. The last schemes were completed in the 1990s. Floodgates would also be required at a number of locations along the wall to maintain access to the port. It is expected to provide protection against a 100-Year flood (1% Annual Exceedance Probability) for fluvial flooding and a 200-Year flood (0.5% Annual Exceedance Probability) against tidal flooding. Flood protection to parts of Ballybofey / Stranorlar is being provided by some existing embankments that were constructed to provide protection to agricultural land, and that were not constructed to the modern engineering standards that would be applied now when providing urban flood protection. The Commissioners of Public Works makes no representations, warranties or undertakings about any of the information provided on these maps, data and reports including, without limitation, their accuracy, their completeness or their quality or fitness for any particular purpose. In the 0.5% coastal AEP design event the high tide in the Shannon estuary will exceed the water level inside the dock and overtop the existing gates. Each polygon has info about the type of flood, the data source, and the area of the flood. agus sonra a bhaineann le creimeadh a chuirtear i lthair ar na larscileanna seo. The Flood Maps have been developed from detailed engineering analysis and modelling. Tugadh na Mapa Tuile chun cinn um chomhlonadh le riachtanais Rialachn na gComhphobal Eorpach (Measn agus Bainisti Priacal Tuile) 2010 go 2015 (na "Rialachin") (ag cur feidhm le Treoir 2007/60/EC) chun creat a bhun um measn agus bainisti priacal tuile, leis an aidhm maol a dhanamh ar dhroch-thortha de dheasca tuilte maidir le slinte daoine, an comhshaol, oidhreacht chultrtha agus gnomhaocht eacnamaoch. These probabilities may also be expressed as the chance or odds (e.g. HEC-1 Flood Hydrograph Package User's Manual 3.4.1 Basic Concepts for Kinematic Wave Routing 12.2 Example Problem #2: Kinematic Wave Watershed Model The wflow routing module uses the pcraster kinematic wave to route water over a DEM. Ullmhaodh na larscileanna seo faoin tionscadal seo a leanas: Ainm an Tionscadail: Staidar ar Straitis um Chosaint Chsta na hireann (ICPSS) given year. The Embankments layer identifies the embankments that form part of Drainage Districts. Flood embankments (average height of 1.2m and a total length of 621m). This layer shows the modelled extent of land that might be flooded by rivers in a very extreme flood event. The Douglas (Togher) Flood Relief Scheme was initiated in 2014 following major flooding in 2012. Construction of new flood defence walls 190m long on the right bank side of the Owenagarney River, upstream and downstream of Bunratty Bridge, (Quay walls on upstream bank). Medium Probability flood events have approximately a 1-in-a-200 chance of occurring or being exceeded in any given year. The potential flood defences would consist of a series of flood embankments (average height of 1.5 m and a total length of 220m), flood walls (average height of 1.2m 20m parapets for bridge, 50m at main channel downstream of Bridge on Main Stream and 50m at side channel north of Newcastle) and road raising (over the existing culvert and at the bridge on main street over a length of 30m and raised by 0.4m (average)). A 5-year programme has been agreed to oversee the establishment of this new service. The proposed measure for Letterkenny AFA that may be implemented after project-level assessment and planning or exhibition and confirmation might include physical works. This system would provide the ability to inform managing authorities and the public of the potential for failure or overtopping of flood defence structures and to trigger emergency response plans. mean sea level of 0.5m (to 2100) has been used in the MRFS. The full Scheme, when completed, will comprise of flood defences walls and embankments and flood retention ponds is designed to provide protection against a 100-Year flood (1% Annual Exceedance Probability) for 28 properties in the Dublin City area primarily against fluvial flooding. change. Comhlonann na Coimisinir na Rialachin um Athsid Faisnise n Earnil Phoibl 2005 (I.R. The Office of Public Works reserves the right to change the content and / or presentation of any of the information provided at its sole discretion, including these notes and disclaimer. The Scheme, which comprises of flood defences walls and embankments, flood retention ponds and floodgates is designed to provide protection against a 100-Year flood (1% Annual Exceedance Probability) for 838 properties; in the two local authorities areas primarily against fluvial flooding. The Irish Coastal Protection Strategy Study (ICPSS) flood hazard mapping is for strategic purposes, The proposed measure for Navan that may be implemented after project-level assessment and planning or Exhibition and confirmation might include physical works, such as a series of hard defences (flood embankments and walls), road raising and clearance of a 500m reach of the Abbeylands Tributary. Flood defences along the property line and localised land and road raising in Salthill will manage wave overtopping risks. The Scheme, that comprises involves increasing the channel capacity by widening the Gaybrook Stream along a 200m length at Aspen, provides protection for 9 properties against fluvial flooding. The proposed measure consist of sea walls with removable barriers for access to slipways etc. The proposed measure consist of the provision of a storage area on the Dalua River upstream of the town along with fluvial Flood Defences on the Dalua and Allow rivers comprising of walls and embankments along with storm water pump stations. This will require a revised sectoral plan to be prepared by the OPW, covering the flood risk management sector. Layer Information 11:44 am AEDT. Past Flood Event The Scheme, which comprises of flood defence walls and a non-return flap valve, provides protection against a 100-Year flood (1% Annual Exceedance Probability) for 27 properties against flooding from the Mornington stream and its tributary. The proposed measure consists of a series of flood walls and road raising. Flood forecasting to allow the community/local authority to ensure that the amenity walkway along the river is cleared and appropriate pedestrian diversions are in place. line is shown that are at risk from erosion, should present defences fail or not be maintained in the future. They are also commonly referred to in terms of a return period (e.g. Construction of 800m of new flood defence walls and 1,200m embankments as will eliminate the flood risk within the AFA for the 0.5% AEP coastal event and the 1% fluvial AEP event. The proposed hard defences avoid impinging on the qualifying habitats for which the SPA / SAC were designated but does not protect a local recreational area. Full details are available here. Further study and data collection are recommended. The Carlow Flood Relief Scheme was initiated in 1996 following severe flooding in 1995 and was constructed from 2010 to 2013. M dhiltaonn t an comhaont dlthiil seo a dhanamh, n fhadfaidh t dul ar aghaidh chun an Suomh Grasin seo a sid n rochtain a fhil ar aon bhar ar an Suomh Grasin. The hard defences have an average height of 1m and a total length of 0.3km. Flooding in Dec 2015/Jan 2016 resulted in some bank erosion and debris being washed into the channel. This layer shows the modelled extent of land that might be directly flooded by rainfall in a moderate rainfall event. This system would provide the ability to inform managing authorities and the public of the potential for failure or overtopping of flood defence structures and to trigger emergency response plans. Glacann t, admhaonn t agus comhaontaonn t leis nach ndanann na Coimisinir aon uirll, barntais, rthaochta n gnthais, cib acu sainrite n intuigthe, go bhfuil an fhaisnis ar an Suomh Grasin, gan teorainn, cruinn, iomln, saor earrid, sln, cothrom le dta, saor fhabhtanna agus/n vris n bhar dobhlach thaobh na teicneolaochta de a dfhadfadh do threalamh romhaireachta, clir agus/n cras a ionfhabht n a bheadh oirinach chun aon chrche faoi leith. The scheme includes consideration of the provision of an early flood warning system and flood barriers for individual property protection in Thomastown. The walls range from 1.1 2.1m in height. The purpose of the schemes was to create land for agriculture. Flooding from other reaches of river may occur, but has not been mapped, and so areas that are not shown as being within a Progress the project-level development and assessment of a Flood Relief Scheme for the Cois Aibhainn Flood Cell in Westport, including environmental assessment as necessary and further public consultation, for refinement and preparation for planning / Exhibition and, if as appropriate, implementation. from other sources (wave overtopping, fluvial, sewers, etc.) Aont le Tarma agus Coinnollacha an tSumh Grasin. To create a report zoom and click on a location of intrest - a symbol will Flood protection in the benefiting lands was increased as a result of the Arterial Drainage Schemes. Layer Information over 6m and 1 No. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. The invert level of these culverts is 35.3m; Regarding of the riverbank 130m upstream and downstream of the bridge to 35.3m to maximize efficiency of the flood alleviation culverts; Construction of two Lock Gates across the Canal and a sluice gate across the channel flowing into the marina from the canal; Upgrade existing culvert to a 2.0m dia. The following table sets out the range of flood event probabilities for which coastal flood extent maps were developed, expressed in terms of Annual Exceedance Probability (AEP), and identifies their parallels under other forms of expression. Improve the capacity of the River Ballynabrennagh and provide embankments on the left bank. The proposed measure consists of building hard defences and improvement of channel conveyance. T an ceadnas seo infheidhme ar feadh tarma na gcearta cipchirt agus sui generis at ceadnaithe anseo. The Scheme comprises flood defence walls and embankments along the Tullamore River and the Barony Stream and provides protection against a 1% AEP (100 year) fluvial event for 100 properties. Consequently, there will be areas where no erosion Diversion of flow, from the Watercourse that flows between Smithstown Industrial Estate and Beech Park Logistic Centre to a natural storage area south east of the watercourse located on the Ballycasey Creek. The Co. Meath elements of the works were primarily centred around Dunboyne and Clonee with flood defence walls and embankments along the Tolka River and a diversion of the Clonee Stream under the M3 Motorway. Data has been produced for catchments greater than 5km2 in areas for which flood maps were not produced under the National CFRAM Programme and should be The flood extents were calculated using data and techniques with various precision levels, and as such, it may not show the true historic peak flood extents. An increase in The High++ End Future Scenario (H++EFS) maps represent a projected future scenario for the end of century (circa 2100) and include allowances for projected future changes in sea levels and glacial isostatic adjustment (GIA). full details are available at the link below. Layer Information The flood wall at Clare Street will continue north for 170m to tie into higher ground. The Commissioners of Public Works reserves the right to change the content and / or presentation of any of the information provided on these maps, data and reports at its sole discretion, including these notes and disclaimer. This layer shows the modelled extent of land that might be flooded by rivers in a moderate flood event. in open coastal areas) would have to be designed to accommodate wave overtopping during the detailed design phase. The proposed measure consists of storage and a series of flood embankments and walls. It went to construction in 2016 and has been completed. The Scheme, which comprises 2.1km of tidal flood defences walls and engineered embankments, glass flood panels, demountable barriers, drainage and storm water pumping. As such, it should be used with caution. The potential improvement in channel conveyance would consist of a bridge replacement with a culvert (1.6m x 6m wide) on the Cromoge River and pipe replacement with culvert (2m x 8m x 15m long) on the Coolataggle tributary. Construction of a 190m new flood defence wall, 340m embankment and a floodgate to defend properties. The Crossmolina Individual Property Protection (IPP) Pilot Scheme was initiated in 2016, with the relevant properties protected by September 2017. Agreement to Terms and Conditions of the Website. The hard defences will provide an SoP of 0.5% AEP for coastal flood events and an SoP of 1% AEP for fluvial flood events. This layer shows the modelled extent of land that might be directly flooded by rainfall in an extremely severe rainfall event. The NSW RFS is the lead agency for bush and grass fires across the state. Please read the following statements and conditions of use of the enclosed survey data carefully. When Phase 1B is complete DCC will make an application to OPW for funding to carry out a second phase of the Scheme along Collins Avenue East, Malahide Road and Collins Park. The Minister and Land Commission were exempted from any responsibility for maintenance of land sold by the Land Commission under Section 10 of the Land Act, 1965, and this responsibility falls on the current landowners, in line with the provisions of the Land Acts. Maintain existing flood forecasting and public awareness campaign operated by the ESB. The maps include an increase of 1500mm in sea levels above the current scenario estimations. Professional or specialist advice should be sought before taking, or refraining from, any action on the basis of the National Indicative Fluvial Mapping or the Website content. Flooding from other sources may occur and areas that are not shown as being within a flood extent may therefore be at risk of flooding from other sources. The proposed measure consists of a series of flood embankments and walls with additional measures in place to protect properties in the Milltown area. Tuigeann an t-sideoir nach rthaonn Oifig na nOibreacha Poibl cruinneas aon cheann de na sonra a thaispentar ar na larscileanna seo agus t s de fhreagracht ar an sideoir for agus rial cilochta a dhanamh go neamhsplech ar aon cheann de na sonra a sidtear agus a chinnti go bhfuil siad oirinach do an sid at beartaithe acu. Tuigeann an t-sideoir nach rthaonn Oifig na nOibreacha Poibl agus Rialtas na hireann cruinneas aon cheann de na sonra suirbh a chuirtear i lthair agus t s de fhreagracht ar an sideoir for agus rial cilochta a dhanamh go neamhsplech ar aon cheann de na sonra a sidtear agus a chinnti go bhfuil siad oirinach don sid at beartaithe acu. This means that areas may be shown to flood, even though at present a flood Arterial Drainage Schemes are schemes the OPW has a statutory duty to maintain. The flow diversion would be located immediately downstream of the bridge where a weir structure would be required to regulate the flow between the proposed flow diversion and the existing channel. Layer Information The Freemount Flood Relief Scheme was initiated in 1998 following major flooding in 1997, and was constructed in 2001 by Cork County Council. The assessment for Trim found no viable measures with a benefit-cost ratio greater than 0.5, and so no further assessment at an AFA-scale was carried out. - 0.25m, 0.5m, 1.0m and 2.0m Digital Elevation Models (DTMs). The Old Connaught scheme was constructed in 2015. You accept, acknowledge and agree that the Commissioners make no representations, warranties, guarantees or undertakings, whether express or implied, that the information on the Website is, without limitation, accurate, complete, free from error, secure, up to date, free from bugs and/or viruses or other technologically harmful material that may infect your computer equipment, programs and/or system or fit for any particular purpose. An earth embankment with an average height of 1m across the floodplain to prevent the flow route from the Milltown House Stream to provide complete protection to properties for the 1% AEP event. Land use management would be assessed to identify land use features that would reduce surface water runoff. ); identify areas of recovery or accretion; support the development and/or updating of numerical coastal Equally, there may be an erosion line shown in areas that are The map was created using groundwater levels measured in the field, satellite images and hydrological models . Glacann t dliteanas agus freagracht ar bith agus uile as lirmhnichn agus sid ar bith bhair ar bith ar an Suomh Grasin at osldlta, lite, n lirmhnithe n sidte agat ar bhealach ar bith n a ironn as bhar ar bith a sheolann t chuig tr p irt. GSI Groundwater Flooding Data Viewer. These probabilities may also be expressed as odds (e.g. The flood recovery map shows incidents on state roads only. The potential effects of climate change have been separately modelled and reported on. Fadfaidh na Coimisinir an Suomh Grasin n cuid ar bith de a fhionr, a aistarraing, a scor n a athr gan ramhfhgra. Mix well, flush, and discharge into the ocean. This represents the probability of an event of this, or greater, severity occurring in any given year. Clean and maintain the Ratass watercourse as it flows through the industrial estate of Manor West. These probabilities may also be expressed as odds (e.g. The Bandon Flood Relief Scheme was initiated in 2010 following major flooding in 2009. This interim scheme has been complemented by a more comprehensive scheme, which has been substantially completed, to provide a higher standard of protection and protect more properties in the town. may be shown to flood, even though at present a flood defence is protecting them. Licensed rights means the rights granted to you subject to these Terms and Conditions which are limited to all copyright and sui generis data rights. Although this Hard Defence option would be located within the Dungarvan SPA, it would protect a number of NIAH buildings along Strand Side South and the at risk properties within the Dungarvan urban area. The High End Future Scenario (HEFS) flood extents represent a projected future scenario for the year 2100 and include greater magnitude) flood events, and that there are areas of Ahascragh at risk of flooding that are not represented in the CFRAM predicted flood maps. This represents the worst case scenario as any flood defences potentially protecting the coastal floodplain are not taken into account. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. It has been assumed that the entire parapet wall will need to be rebuilt, with the average height being 1.5m above existing road level. The Scheme comprises of a combination of embankments, walls, channel straightening, bridge underpinning and localised dredging and is expected to provide protection against a 100-Year flood (1% Annual Exceedance Probability) for 80 properties against fluvial flooding. There is always some uncertainty the 100-year flood), although this period is not the The purpose of the survey was to obtain a comprehensive and up to date record of the present coastal erosion situation around the entire coastline of Ireland in order to facilitate the identification of priority areas for future expenditure. Flood forecasting will also be required as part of this measure. If any provision of these disclaimer, guidance notes and conditions of use shall be unlawful, void or for any reason unenforceable, that provision shall be deemed severable and shall not affect the validity and enforceability of the remaining provisions. The work undertaken for the Dublin FloodResilienCity Project forms the basis of a Pluvial Flood Risk Management Strategy for Dublin. Full details are available here. These hard defences would protect at risk properties from the 1% AEP fluvial event and the 0.5% AEP coastal event with an average height of 1.2m and a total length of 1.3km. Levels will trigger a warning to be issued to the few properties at risk. The Scheme comprises flood defence walls and embankments along the Brosna River and provides protection against a 1% AEP (100 year) fluvial event from the Brosna River for 20 properties. This is also referred to as an Annual Exceedance Probability (AEP) of 1%. It is expected to go to construction in 2019/2020 and to be completed in the following two years. Raised road level over a length of 20m along the north of Portumna Harbour. These hard defences would protect to the 1% AEP fluvial flood event with an estimated average height of 1.1m and a total length of 276m. The maps also provides idea of topography and contour of Taree,Australia. The city is seeing its worst flooding in decades as the downpour continues. Layer Information Faoi rir ag na Tarma agus Coinnollacha, t cead agat bhar na Mapa Tuile a chipeil, a fhoilsi, a scaipeadh agus a tharchur ach na coinnollacha seo a leanas a chomhlonadh: nl cead agat an t-bhar a athr n a oirin; n folir duit foinse an bhair a admhil leis an raiteas seo a leanas a chur isteach: "Cuimstear faisnis Oifig na nOibreacha Poibl Oifig na nOibreacha Poibl"; n folir duit foinse na mapla clra a admhil leis an riteas seo a leanas a chur isteach: "Cuimstear faisnis Suirbhireacht Ordanis ireann Suirbhireacht Ordanis ireann"; n folir duit a chinnti nach n-sideann t an t-bhar ar bhealach a thugann stdas oifigiil le fios n go dtacaonn Coimisinir na nOibreacha Poibl in irinn leat n le hsid an bhair agat; n folir duit a chinnti nach gcuireann t daoine eile ar mhthreoir n bragliri a dhanamh ar an bhar n a fhoinse, n an t-eolas n abhar a sid ar bhealach dobhlach do na Coimisinir, do Chomhairle Cathrach Bhaile tha Cliath, ddars itiil ar bith eile, n do Shuirbhireacht Ordanis ireann; aontaonn t gan an t-bhar a sid um fhgraocht n cur chun cinn seirbhse n tirge ar leith, n chun crche ar bith at neamhdhleathach, mmhorlta, calaoiseach n m-ionraic; n folir duit a chinnti nach sraionn sid an bhair agatsa reachtaocht um Chosaint Sonra mar a leasatear am go ceile; n folir duit a chinnti nach ndanann t iar-innealtireacht, dthioms, etc, ar chd, sonra n bhar ar an Suomh Grasin chun tacar sonra n bhar ar bith eile a athchruth. These areas were divided into one or more map tiles depending on area, and maps were produced for each tile. This means that The Manning River Flood Study has been prepared for Greater Taree City Council (Council) to define the existing flood behaviour in the catchment and establish the basis for. T na cearta ceadnaithe teoranta datirgeadh agus do chomhroinnt (ach n modhn) an bhair cheadnaithe chun crocha neamhthrchtla de rir na dTarma agus na gCoinnollacha seo. individual properties or point locations, or to replace a detailed local erosion hazard and risk assessment. Two weirs would be removed on the Nuenna River (02WEIR02 at Chainage 1227 and 03WEIR01 and Chainage 1240). During flood events the Silver stream acts as a flow path for flood waters from the River Suck. COINNOLLACHA SIDE AGUS NTA TREORACH The High-End Future Scenario extents where generated taking in in the potential effects of climate change using an increase in rainfall of 30% and sea level rise of 1,000 mm (40 inches). (wave overtopping, fluvial, sewers, etc.) Larger culvert box to be provided. Flood event probabilities are referred to in terms of a percentage Annual Exceedance Probability, or AEP. In doing so, and as part of a fully integrated strategy for all flood risks under the Dublin Flood Initiative, Dublin can act as an exemplar city in contributing to continual development of good practice in pluvial flood risk management as well as wider and integrated flood management practice in Europe. The River Fergus Upper (Ennis) Certified Drainage Scheme was constructed from 2008 to 2010. The Minister and Land Commission were exempted from any responsibility for maintenance of land sold by the Land Commission under Section 10 of the Land Act, 1965, and this responsibility falls on the current landowners, in line with the provisions of the Land Acts. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. is not accounted for and needs to be considered separately. An allowance of -0.5mm/year for GIA was included for the southern part of the national coastline only (Dublin to Galway and south of this). The proposed further measure for Leixlip that may be implemented after project-level assessment and planning or Exhibition and confirmation might include physical works, such as a series of hard defences (flood embankments and walls). to eliminate the effect of existing coastal defence structures from the erosion hazard and risk assessment. The OPW will work with the Environment Protection Agency, Local Authorities and other agencies during the project-level assessments of physical works and more broadly at a catchment-level to identify any measures, such as natural water retention measures (such as restoration of wetlands and woodlands), that can have benefits for Water Framework Directive, flood risk management and biodiversity objectives. It is recommended that the viability of this method is analysed further through detailed design. Emergency construction started immediately following the November 2002 event with the majority of the works completed between 2003 and 2009. Other at risk properties would be protected by a diversion of flow and improvement of channel conveyance. At Taree (Macquarie Street), the 1929 event resulted in the highest flood on record, with a peak level of 5.6 m AHD. The proposed measure have been investigated for Milltown. year. mean sea level of 1.0m (to 2100) has been used in the HEFS. The Land Commission took over a number of embankments as part of it's work. This FRM option would protect to the 1% AEP flood event by removing a weir downstream of Drogheda Bridge, dredging approximately 1135m 3 of material and underpinning four bridges along Strand Road. These embankments were created by landowners to reclaim land from rivers or the sea, typically in the 19th century. A Government Task Force on Emergency Planning is currently drafting a Strategic Emergency Management (SEM): National Structures and Framework document. These probabilities may also be expressed as the chance or odds (e.g. The Scheme, which comprises, construction of hard defences (embankments & flood walls), is expected to provide protection against an estimated 100-Year fluvial flood (1% Annual Exceedance Probability) and a 200-Year flood (0.5% Annual Exceedance Probability) tidal event for 11 properties.
Prayer Points For Deliverance And Breakthrough, Articles T